Blog Layout

Time it takes to build: Dig to swim: Varies based on scope of project, your contractor and things out of everyone’s control.
  • Time of year – always a good time
  • Rainy season vs. holiday (delays)
Permits / Inspections – Permits will be pulled by your contractor and inspections scheduled as necessary. A contractor cannot guarantee they can get an inspector to come out the moment they have completed a portion of the project that requires an inspection.

Weather – One day of rain can delay a week plus. If forecast is for rain it can still affect progress.

Change orders / materials – Any time you change what you want for the project, including materials and finishes, the project will be delayed and additional costs may be incurred.

Production – should be based on weekly progress, not daily

Utilities – When digging, waterline, utilities many underground, obstructions not able to be located, old sewer lines, septics, etc. – Speak with your contractor to understand what possible delays and costs could be incurred if an issue arises.

Access – What is required beyond ability to get in the backyard – what is around the project

Cost – Depending on scope of project. From a minimum basic pool of $30,000 and up

Contracts – Ask questions and be sure you understand what you are agreeing to. Payment terms / conditions

What’s excluded: general underground / soil / utility / access
07 Sep, 2023
10 Great Reasons To Have A Pool
By Alyssa Stoner 09 Feb, 2023
‘Light Up’ Your Backyard with Impressive Pool Lighting!
By Alyssa Stoner 27 Jan, 2023
Saltwater Pool 101: Is it Right for You?
Show More
Share by: